EPA removes the R-410A installation deadline for existing equipment
A May 2026 final rule lets residential and light-commercial systems built before 2025 be installed until inventory runs out. The 2025 manufacturing cutoff still stands.
Process piping, heating, ventilation and plumbing, planned alongside our electrical and fire protection crews so pipe, duct and conduit fit the first time.

Pumps, boilers, air handlers, piping, duct, sprinkler mains and cable tray all compete for the same few metres of ceiling and floor. When those systems are installed by separate contractors, the first trade in tends to take the best route and everyone else works around it.
Our mechanical crews plan their work with our electrical and fire protection teams from the start. The result is mechanical rooms that are easier to build, easier to maintain and that leave access to the equipment operators will need to reach.
Delivered by our own mechanical crews, coordinated with the rest of the Enertec team on the same project.
Stainless, carbon steel and ductile iron piping for pumping, treatment and industrial process systems.
Air handling, exhaust and make-up air systems, including ductwork and controls coordination.
Domestic water, sanitary and storm systems for residential and institutional buildings.
Boilers, chillers, heat pumps and the pumps and piping that connect them.
Heating and chilled water distribution, balanced and commissioned.
Shop and field fabrication of piping assemblies and supports.
The same sequence on every project, adapted to the facility and the schedule.
Pipe and duct routed with electrical and sprinkler layouts before anything is fabricated.
Spools, headers and pump skids built in controlled conditions and delivered ready to set.
Systems installed, supported and pressure tested section by section.
Equipment started with the manufacturer, systems flushed, balanced and handed over.

Because our mechanical, electrical and fire protection crews coordinate from the same drawings, conflicts get solved in the model instead of on site.
Prefabricated piping assemblies cut install time in tight mechanical rooms and occupied buildings.
Mechanical work across the sectors we serve, often alongside our other trades on the same project.







Code changes and industry updates that affect mechanical work.
All news
A May 2026 final rule lets residential and light-commercial systems built before 2025 be installed until inventory runs out. The 2025 manufacturing cutoff still stands.

EPA has formally proposed keeping the PFOA and PFOS limits while extending their compliance date and rescinding limits for four other PFAS. Until it’s final, the 2024 rule stands.

ABC’s estimate of the US construction workforce shortfall fell for the second year running, while Canada faces a large wave of retirements. Skilled trades remain in short supply.
Tell us about the scope, location and schedule. We'll come back with how we'd approach it and which of our trades it needs.